Charles Harwood Hospital, Parking Lot
St. Croix, USVI
The Department of Health needed a new parking lot at the Charles Harwood Hospital and J. Benton Construction won the contract. This scope of work included demolition of existing structures, site grading, concrete curb and gutter, concrete swales, trench drains, HDPE storm drainage piping, headwalls and asphalt paving and striping.
Delivery Method
General Contractor
Cost
< $1 Million
Architect
Department of Public Works